
Circulating Water Pipe Reline with Structural Fiberglass
After the steel portion of this underground circulating water pipe failed, Universal Blastco built an entire structural fiberglass pipe inside

After the steel portion of this underground circulating water pipe failed, Universal Blastco built an entire structural fiberglass pipe inside

Universal Blastco was contracted to secure 4 stories of fiberglass spray header joints.

This gold mine had belt guards made of steel that were quickly corroding and rusting due to the harsh level