Fuel Oil Tank Floor Restoration & Lining
The steel floor was pitted from microbial induced corrosion. If Universal Blastco hadn’t fixed it, the floor would have eventually deteriorated completely from the corrosion.
Water Treatment Filter Bay Concrete Linings
The time had come for all the filter bays to be completely relined at this Water Services Treatment Plant.
Lead Abatement and Painting at Hydroelectric Power Plant
Protective coatings and linings are critical for protecting hydroelectric power plants from abrasion, corrosion and damaging UV
Power Plant Water Box FRP Liner
Univeral Blastco fixed the structal damage by applying a fiberglass solution, adverting the need for extensive demo and reconstruction.
Tank Farm Secondary Containment Concrete Repair and Lining
This secondary containment area had severely eroded concrete, which could allow chemicals to seep into the ground in the event of a spill.
Chlorination Tower Crossover Reline
When this crossover’s elbow gave out, Universal Blastco came in immediately providing a proper fix that would last until the next outage.
HD Tank Upper Barrel Rebuild and New FRP Roof
Universal Blastco rebuilt the top 20 feet of this 1950’s HD tower, and built a custom FRP roof to replace the previous one.
Prefabricated Structural FRP Liner in Sump
When we saw how saturated this concrete was, we knew that a coating was not going to be an option to restore this sump.
Bleach Washer Vat FRP Reline
Talents combined from our FRP and Industrial Masonry divisions to reline this bleach washer vat.
Why you should care if your industrial painting contractor is QP1 Certified
The QP1 Certification ensures contractors are meeting standards and best practices for industrial painting projects.