
Containment Area Repair and Coating
This concrete containment area was completely worn down from excessive acid leaks and puddling.
This concrete containment area was completely worn down from excessive acid leaks and puddling.
After the steel portion of this underground circulating water pipe failed, Universal Blastco built an entire structural fiberglass pipe inside
We repaired the sump under this paper machine in just 32 hours.
Universal Blastco was contracted to reline 3 steel underflow tanks that had coating failures.
A Zinc Recycling plant had a carbon steel tank that was facing continual nozzle leaks. It got to the point
Universal Blastco was subcontracted to reline the interior of this 34,000 square foot scrubber duct. It was completed in two