
Clarifier Rake Reline
This clarifier’s rake, shaft and bell housing had a lot of sludge buildup. Universal Blastco was contracted to blast

This clarifier’s rake, shaft and bell housing had a lot of sludge buildup. Universal Blastco was contracted to blast

This concrete containment area was completely worn down from excessive acid leaks and puddling.

We repaired the sump under this paper machine in just 32 hours.

After the ebonite rubber lining in 6 Electrolyte Filter Tanks began to fail, the customer came to us for guidance

Universal Blastco was contracted to reline 3 steel underflow tanks that had coating failures.

A Zinc Recycling plant had a carbon steel tank that was facing continual nozzle leaks. It got to the point