HD Tank Upper Barrel Rebuild and New FRP Roof
Comments Off on HD Tank Upper Barrel Rebuild and New FRP RoofUniversal Blastco rebuilt the top 20 feet of this 1950’s HD tower, and built a custom FRP roof to replace the previous one.
Universal Blastco rebuilt the top 20 feet of this 1950’s HD tower, and built a custom FRP roof to replace the previous one.
The QP1 Certification ensures contractors are meeting standards and best practices for industrial painting projects.
These three demineralization tanks’ interior rubber linings had well exceeded their lifespan.
After years of sulphuric acid attack, this protective brick floor lining had well exceeded its lifespan.
Universal Blastco was subcontracted to reline the interior of this 34,000 square foot scrubber duct. It was completed in two stages.