
New Construction of Tile Filtrate Chest
Universal Blastco was contracted by Weiland to build a new 3,500 square foot paper mulch tank for a paper mill

Universal Blastco was contracted by Weiland to build a new 3,500 square foot paper mulch tank for a paper mill

After the ebonite rubber lining in 6 Electrolyte Filter Tanks began to fail, the customer came to us for guidance

Universal Blastco was contracted to reline 3 steel underflow tanks that had coating failures.

A Zinc Recycling plant had a carbon steel tank that was facing continual nozzle leaks. It got to the point

Universal Blasto was subcontracted by Fisher Tank to replace an interior rubber lining on two clarifier tanks. The work needed