Circulating Water Pipe Reline with Structural Fiberglass
After the steel portion of this underground circulating water pipe failed, Universal Blastco built an entire structural fiberglass pipe inside

After the steel portion of this underground circulating water pipe failed, Universal Blastco built an entire structural fiberglass pipe inside

We repaired the sump under this paper machine in just 32 hours.

After the ebonite rubber lining in 6 Electrolyte Filter Tanks began to fail, the customer came to us for guidance

Universal Blastco was contracted to reline 3 steel underflow tanks that had coating failures.

Universal Blastco was contracted to secure 4 stories of fiberglass spray header joints.

This gold mine had belt guards made of steel that were quickly corroding and rusting due to the harsh level

Alright, so maybe choosing the lowest bidder for your next lining and coating job doesn’t feel like settling – but

A Zinc Recycling plant had a carbon steel tank that was facing continual nozzle leaks. It got to the point

Universal Blasto was subcontracted by Fisher Tank to replace an interior rubber lining on two clarifier tanks. The work needed

Universal Blastco was subcontracted to reline the interior of this 34,000 square foot scrubber duct. It was completed in two